2023 - Projects
|
Hidden Hills
Description: Road Project
Complete 2023
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
21st West of 305th
Description: Road Project
Complete 2023
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
Woodland Hills, IV and South
Description: Road Project
Complete 2023
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
2021-2022 - Projects
|
329th from 51st - 61st
Description: Road Project
Complete 2020
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
321st from 51st - 61st
Description: Road Project
Complete 2020
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
48th West of 305th
Description: Road Project
Complete 2020
|
Problem: Roadway.
Solution: Oil & Chip.
Learn More
|
|
36th West of 305th
Description: Road Project
Complete 2020
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
21st West of 305th
Description: Road Project
Complete 2020
|
Problem: Roadway.
Solution: Oil & Chip.
Learn More
|
|
280th North of 21st
Description: Road Project
Complete 2020
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
2019 - Projects
|
41st & 265th Bridge
Description: Bridge Repair
Complete 2019
|
Problem: Flooding.
Solution: Repairs to road due to flooding.
Learn More
|
|
Bluff Landing Road (369th & 71st)
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Replace pipe and repair road due to flooding.
Learn More
|
|
273rd & 58th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Replace pipe and repair due to flooding.
Learn More
|
|
41st & 284th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Replace pipe and repair due to flooding.
Learn More
|
|
31st West of 257th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Repair road due to flooding.
Learn More
|
|
32nd & 290th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Repair road due to flooding.
Learn More
|
|
390th & 113th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Repair road due to flooding.
Learn More
|
|
21st 1/2 Mile East of 305th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Repair road due to flooding.
Learn More
|
|
273rd & 46th
Description: Bridge Repair
Complete 2019
|
Problem: Flooding.
Solution: Repair bridge due to flooding.
Learn More
|
|
65th & 337th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Reset half tank and repair road due to flooding.
Learn More
|
|
305th & 59th
Description: Road Project
Complete 2019
|
Problem: Flooding.
Solution: Repair road due to flooding.
Learn More
|
2018 - Projects
|
21st Street between 257th & 273rd
Description: Road Project
Complete 2018
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
305th from Salt Creek Bridge - 51st
Description: Road Project
Complete 2018
|
Problem: Roadway.
Solution: Asphalt Overlay.
Learn More
|
|
353rd (Lonestar) Bridge So. of 101st
Description: Road Project
Complete 2018
|
Problem: Bridge is functionally obsolete.
Solution: New bridge.
Learn More
|
2017 - Projects
|
305th and 8th Salt Creek Bridge
Description: Road Project
Complete 2017
|
Problem: Bridge is functionally obsolete.
Solution: Currently working with engineers and a design is in progress. Our hopes are to widen and lengthen the bridge to accommodate the creek.
Learn More
|
|
Midway (257th) from 41st to 61st
Description: Road Project
Complete 2017
|
Problem: Roadway.
Solution: Improved roadway with asphalt overlay.
Learn More
|
|
289th from 61st - 71st
Description: Road Project
Complete 2017
|
Problem: Roadway.
Solution: Asphalt overlay
Learn More
|
|
Blue Springs 94th and 273rd
Description: Road Project
Complete 2017
|
Problem: Roadway.
Solution: Asphalt overlay
Learn More
|
|
289th from 101st - Muskogee Turnpike
Description: Road Project
Complete 2017
|
Problem: Roadway.
Solution: Asphalt overlay
Learn More
|
|
101st Between 305th - 337th
Description: Road Project
Complete 2017
|
Problem:
Solution: Cleared fence row, cleaned ditches, and raised the roadway in preparation for Chip & Oil spray.
Learn More
|
2016 - Projects
|
Admiral from 225th-257th
Description: Road Project
Complete 2016
|
Problem: Raodway.
Solution: Paired with Tulsa to improve asphalt roadway and new striping.
Learn More
|
|
11th East of 193rd
Description: Road Project
Complete 2016
|
Problem: Roadway.
Solution: Improved roadway with asphalt overlay.
Learn More
|
|
257th Between 31st-41st
Description: New Asphalt Layover
Complete 2016
|
Problem: Roadway.
Solution: Assisted Tulsa with asphalt overlay, striping, and building up the roads edge.
Learn More
|
2015 - Projects
|
21st & 285th
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
|
21st & 256th
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
|
Timberbrook Addition
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
|
295th & 67th
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
|
104th West of 289th
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
|
Front Street
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
|
61st East of 225th
Description: Road Project
Complete 2015
|
Problem: Flooding.
Solution: Repairs to culvert and roadway due to flooding.
Learn More
|
2014 - Projects
|
305th from 71st - 111th
Description: Road Project
Completed in 2014
|
Problem: Roadway had several poor spots that were worsening.
Solution: Street was asphalted.
Learn More
|
|
31st from 193rd to The Creek Turnpike
Description: Road Project
Complete
|
Problem: Roadway had several poor spots.
Solution: Roadway was re-asphalted.
Learn More
|
|
305th from 71st to 51st
Description: Road Project
Complete
|
Problem: Roadway was deteriorating due to high traffic.
Solution: Asphalted and striped roadway to make a safer travel.
Learn More
|
|
111th-from-353rd-369th
Description: Road Project
Complete 2014
|
Problem: Roadway was very narrow and had several poor spots.
Solution:Roadway was chip and oiled as well as widened for a safer travel.
Learn More
|
2013 - Projects
|
289th (15th-16th)
Description: Road Project
Completed 2013
|
Problem:There was no roadway at 289th E. Ave between 15th and 16th.
Solution:Trees and shrubs were cleared out and a new roadway was established. The road was built up with proper materials and drainage was added.
Learn More
|
|
337th and 129th Which is Deer Crossing III
Completed 2013
|
Description:129th was previously a dirt road with several pot holes we have since Chip and oiled all of 129th onto part of 337th.
Learn More
|
|
71st and 305th - 273rd
Description: Road Project
Completed in 2013
|
Problem: The roadways foundation was uneven.
Solution: Roadway was leveled, asphaulted and striped.
Learn More
|
|
337th between 61st & 71st
Description: Road Project
Completed in 2013
|
Problem: Roadway was previously gravel.
Solution: Chip and Oiled the roadway for road improvements.
Learn More
|
|
Lonestar
71st and 121st roadway
Description: Road Project
Completed 2013
|
Problem/Solution: Roadway improvement / agg base lay down this project was completed in August of 2013.
Learn More
|
|
101st between 305th and 353rd
Description: Road Project
Completed in Mid 2013
|
Problem: Several pot holes and uneven roadway.
Solution: 101st was chip and sealed for improvements.
Learn More
|
|
111th between 305th and 353rd
Description: Road Project
Completed in Mid 2013
|
Problem: Several pot holes and uneven roadway.
Solution: Roadway was chip and sealed for improvements.
Learn More
|
|
71st and 293rd Woodland Hills Addition
Description: Road Project
Completed in 2013
|
Problem: Road way needed to be rejuvenated because it was previously not finished properly.
Solution: Woodland Hills Addition completed in 2013 the county micro sealed the addition for roadway improvements.
Learn More
|
|
21st and 280th
Description: Road Project
Completed in 2013
|
Problem: Roadway was extremely uneven and rough.
Solution: Road was asphalted to create a smoother drive.
Learn More
|
|
353rd from 71st - 121st
Description: Road Project
Completed in 2013
|
Problem: Several poor spots throughout roadway.
Solution: Reparied by asphalting roadway.
Learn More
|
2012 - Projects
|
305th East of 51st
Description: Road Project
Completed in 2011-2012
|
Problem: The road was subject to flooding and damage during rain.
Solution: Elevated road and fixed damage resulting in a safer road for commute.
Learn More
|
|
Oneta (241st E. Ave)
Description: Road Project
Completed 2012
|
Problem: The Road was functionally obsolete, narrow, and unstable to sustain road materials. The creek would rise on to the embankment of the road, which caused flooding.
Solution: The embankment was protected and the road was elevated to prevent flooding. Protecting the embankment and elevating the road provided a wider, safer road for emerency vehicles, school busses, and constituents.
Learn More
|
|
101st and 289th E. Ave
Description: Road Project
Completed in 2012
|
Problem: The road was narrow, functionally obsolete, had improper drainage, and did not have a base. The area was also overgrown with trees and shrubs.
Solution: The road was widened, built up wiht proper road materials, and drainage was fixed. The overgrown trees and shrubs were also cleared out providing a safer road for emergency vehicles, school buses, and constituents.
Learn More
|
|
41st between 257th & 273rd
Description: Bridge
Completed in 2012
|
Problem: The Bridge was subject to flooding and erostion during rain.
Solution: Re-built the Bridge which prevented flooding and damage.
Learn More
|
|
Road Striping
Description: Road Project
Completed 2012
|
Problem: The original striping, on various roads in District 1, faded.
Solution: Roads were re-striped for public safety, to help traffic flow at night and during storms.
Learn More
|
|
41st from 241st - 257th
Description: Road Project
Completed in Mid-Late 2012
|
Problem: Roadway was in need of a smoother overlay due to multiple pot holes.
Solution: Overlayed road with asphalt for a safer travel.
Learn More
|
|
104th West of 289th
Description: Road Project
Completed in 2012
|
Problem: Roadway was in poor condition .
Solution: Chipped and Oiled roadway, and then was Asphalted for a smoother surface.
Learn More
|
|
301st North of 81st
Description: Road Project
Completed in 2012
|
Problem: Road was previously all gravel.
Solution: Chipped and Oiled roadway for a smoother surface.
Learn More
|
|
287th South of 101st
Description: Road Project
Completed in 2012
|
Problem: Road was extremely narrow and had multiple deep potholes.
Solution: Roadway was asphalted for a smoother surface and also widended to help traffic flowage.
Learn More
|
|
91st and 305th
Description: Road Project
Completed in 2012
|
Problem: Roadway is very narrow with overgrown trees.
Solution: Trimmed trees back, build the roadway up, widened and overlayed with asphalt.
Learn More
|
2011 - Projects
|
Coal Creek Bridge from 273rd between 81st - 91st
(273rd Oak Grove)
Description: Bridge
Completed in 2011
|
Problem: Coal Creek Bridge began to fall apart and became dangerous for commuters.
Solution: Re-built Coal Creek Bridge resulting in a safer commute for emergency vehicles, school busses, and constituents.
Learn More
|
|
52nd and 281st
Description: Road Project
Completed in 2011
|
Problem: Roadway was narrow and unsafe for Emergency Vehicles and School Buses.
Solution: The roadway was widened and resurfaced for safer travel.
Learn More
|
|
31st / 289th Verdigris Mountain Estates
Description: Road Project
Completed in 2011
|
Problem: Roadway was uneven and had pot holes.
Solution: Resurfaced to improve travel for residence, buses and emergency vehicles.
Learn More
|
|
Spunky Creek Bridge Admiral West of 209th
Description: Road Project
Completed in 2011
|
Problem: Bridge was causing flood damage.
Solution: Rebuilt for flood prevention and better commuting for citizens and emergency vehicles.
Learn More
|
|
25th and 305th
Description: Road Project
Completed in 2011
|
Problem: Bridge was previously a box culvert and lacked proper flowage.
Solution: ODOT re-constructed bridge for a better flowage and smoother surface.
Learn More
|
|
273rd from 31st - 71st
Description: Road Project
Completed in 2011
|
Problem: Roadway had multiple pout holes and was unlevel.
Solution: Street was Micro Sealed to improve with a leveled surface.
Learn More
|
|
81st from 273rd - 305th
Description: Road Project
Completed in 2011
|
Problem: Roadway was in need of a smoother overlay due to multiple pot holes.
Solution: Overlayed road with asphalt for a safer travel.
Learn More
|
|
71st from 369th - 385th
Description: Road Project
Completed in 2011
|
Problem: Previously was chipped and oiled but has been worn down through time.
Solution: Rechipped and oiled roadway.
Learn More
|
|